CODE A77 BUSINESS #SMELTERFORSALE (Tambang Nickle ) #NICKLEMINING #NICKLEFORSALE IN INDONESIA

2 Factory Address: Pomalaa, Kolaka, Southeast Sulawesi

3 Taxpayer Identification Number : 02.069.997.1-028.000

4 Capitalization Status : National

5 Company Deed of Establishment & Judicial Registration : No. 70 January 18, 2002

Minister of Law and Human Rights Decree No. AHU-0116.AH.02.01 YEAR 2010

6 Company Registration Certificate : 210312400064

7 Business License (National)/BKPM (Foreign) : 503.2/00514/BP-PB/SIUP/KPPT/XII/KLK/2014

8 Nissue Permit: 503/11721/1G-B/09/BPIPM Documentation Certificate 600/519/XII/2014

6.2. Activity Description

6.2.1 Equipment

 Equipment and Raw Materials

The smelter is located on a 68,231-hectare site. Nickel ore is processed into pig iron (NPI) using the Blast Furnace method, with a production capacity of 144,000 tons of NPI per year.

The main components of the smelter include the blast furnace, sintering area, power plant, stockpile yard, other facilities, office area, and environmental engineering facilities. Facilities and infrastructure are presented in Table 6.1.

Table 6.1 Facilities and Infrastructure

No. Engineering Content Main Equipment

Description

1. Blast Furnace System

60 M2 Blast Furnace

8 Sets


2. Sintering System

36 M2 Circular Sintering Machine

8 Sets


3.Power Plant

3 MW Gas Generator

Boilers

8 Sets


4. Stock Yard

For Raw Materials

500 M X 500 M


5. Other Facilities

Boiler Room, Blower Room, Pump Room, and Power Station

20 m X 20 m

10 m X 10 m

10 m X 10 m

10 m X 10 m









Comments